Monolith Atelier AGArchitecture and urban form

StudiosZürich · Basel · Milano

Practice since 200434 people, 84 buildings

Now on the boardsAarau library competition, due 30.11.

Form follows rigour.

ABCDE123430.0022.50+27.30+18.00±0.00
Fig. 00Werkgasse studio and gallery, axonometric 1:500. Red: public gallery cantilever at +18.00.

We are an architecture studio in Zürich. Thirty-four architects, one grid, no ornament: civic, cultural and domestic buildings that are exact in plan, honest in material and calm enough to last two centuries.

Buildings completed since 2004
84
Projects on site or in design
23
Competitions won, of 112 entered
19

Index

Selected projects, 2018–2025. Nine buildings in order of completion. Hover or select a row to see its drawing.

Selected projects with number, name, location, year and type
No.ProjectLocationYearType
01 Küsnacht, CH 2025 Residential
02 Lenzburg, CH 2024 Cultural
03 Winterthur, CH 2023 Civic
04 Zürich, CH 2023 Commercial
05 Lugano, CH 2022 Residential
06 Basel, CH 2021 Cultural
07 Zürich, CH 2020 Civic
08 Milano, IT 2019 Commercial
09 Zürich, CH 2018 Residential

Kunsthalle Seetal

Case study. Open competition, first prize 2019. Completed September 2024, Lenzburg.

A low concrete hall on the edge of a lakeside town, lit entirely from the north.

Kunsthalle Seetal replaces a disused grain store with four column-free halls under a single sawtooth roof. Every tooth faces north, so the galleries receive an even, shadowless light from morning to evening without a single blind.

The plan is an enfilade: visitors pass from the foyer into Hall A and walk east through all four rooms without retracing a step. Below, a climate-stable archive holds the foundation’s 11,000 works on paper.

Ground floor planAAHall AHall BHall CHall DFoyerCourtCaféWorkshopEntranceN01020 m

Fig. 2.1 Ground floor plan 1:500. Red: visitor route through the enfilade.

Client
Seetal Art Foundation
Programme
4 exhibition halls, archive, foyer, café, workshop
Procedure
Open competition, 1st prize
Completion
September 2024
Floor area
4,860 m² GFA
Structure
In-situ concrete, glulam roof
Energy
Ground-source heat, 410 kWp solar
Exhibition area in four column-free halls
1,640m²
Recycled aggregate in the concrete, crushed from the old silo
41%
Blinds or shading devices in the galleries. North light only.
0

2.4 Programme Competition to opening, 2019–2024

  1. CompetitionMar–Jun 2019 · 1st of 64

  2. Design and permitSep 2019 – Dec 2020

  3. TenderJan–Jun 2021 · 31 trades

  4. ConstructionAug 2021 – Jun 2024

  5. Opening14 September 2024

Works

Twelve buildings, four typologies. Every project is shown the same way: one drawing, one paragraph, no renderings.

Showing 12 of 12 projects

  • 01

    Haus Hangkante

    2025

    A concrete house cut into a vineyard slope, cantilevered towards the lake.

    Küsnacht, CH Residential
  • 02

    Kunsthalle Seetal

    2024

    Four north-lit halls under one sawtooth roof. See the case study below.

    Lenzburg, CH Cultural
  • 03

    Archive Pavilion Töss

    2023

    A square municipal archive on a 6.5 m grid around a single spiral stair.

    Winterthur, CH Civic
  • 04

    Werkhof Altstetten

    2023

    Workshops and offices for a joinery cooperative in a timber shed hall.

    Zürich, CH Commercial
  • 05

    Casa Tre Muri

    2022

    Three parallel stone walls carry the roof; everything between is glass.

    Lugano, CH Residential
  • 06

    Rhine Reading Room

    2021

    A riverside public library lit by a single clerestory monitor.

    Basel, CH Cultural
  • 07

    Fire Station North

    2020

    Four engine bays, a hose tower and twelve dormitories on a tight urban plot.

    Zürich, CH Civic
  • 08

    Kontor Quattro

    2019

    Four office floors, each shifted to frame a different view of the city.

    Milano, IT Commercial
  • 09

    Grünau Row Houses

    2018

    Fourteen cooperative row houses with shared gardens and one repeated gable.

    Zürich, CH Residential
  • 10

    Studio Theatre Oerlikon

    2017

    A black box for 280 seats behind a fully glazed public foyer.

    Zürich, CH Cultural
  • 11

    School Pavilion Buchegg

    2016

    Four classrooms turn around a top-lit hall in a pinwheel plan.

    Zürich, CH Civic
  • 12

    Market Hall Letten

    2015

    Five shallow brick vaults over a covered market and a cold store.

    Zürich, CH Commercial

Studio

How we work. Four rules, written in 2004 and pinned above every desk since.

We draw until nothing more can be taken away. Then we build it in concrete, timber and stone, and leave it alone.

NESW21 JunEquinox21 Dec
Sun path, Zürich 47.4° N. Every project starts with this diagram.
  1. Grid before gesture

    Every project begins as a structural grid. Rooms, façades and furniture follow its dimensions, so the building reads as one decision rather than a hundred.

  2. Material is structure

    No cladding that pretends. Concrete stays concrete and timber stays timber: what carries the load is what you see and touch.

  3. Light is programme

    We fix orientation, section and openings before we plan a single room, then fit each use to the light it needs.

  4. Build for 200 years

    Generous floor heights, demountable fit-outs and repairable details let a building change use several times before it needs to change shape.

Services

From first sketch to handover. One team stays with a project through every phase.

SIA 112 phases1Strategy2Studies3Project4Tender5Construction6Operation

  1. 01

    Competitions

    Open and invited competitions for public clients and foundations. We enter six to eight a year and have won 19 since 2004.

    DeliverablesConcept, models 1:500, cost check123456
  2. 02

    Architecture

    Full service from brief to handover: design, building permit, tender, site supervision and cost control under one fee.

    DeliverablesProject, permit, tender, site123456
  3. 03

    Urban design

    Masterplans, density studies and public space for municipalities, housing cooperatives and landowners.

    DeliverablesStudies, design guidelines123456
  4. 04

    Renovation and heritage

    Careful repair and extension of listed and post-war buildings, from measured survey to structural and energy retrofit.

    DeliverablesSurvey, retrofit, extension123456
  5. 05

    Interiors and furniture

    Fixed furniture, lighting and signage designed on the same grid as the building and built with makers we know.

    DeliverablesDetails 1:1, prototypes123456
  6. 06

    Research

    Material research in our model workshop, recycled-concrete trials with two regional suppliers, and post-occupancy monitoring of our own buildings.

    DeliverablesReports, mock-ups, an annual book123456

Awards

Recognition, 2019–2025. A selection from prizes, distinctions and shortlists.

27 prizes and distinctions since 2004, including 19 first places in architectural competitions.

Selected awards with year, award, project and result
YearAwardProjectResult
2025Alpine Residential PrizeHaus HangkanteWinner
2024Culture Building Award, AargauKunsthalle SeetalWinner
2024European Museum Architecture BiennialKunsthalle SeetalShortlist
2023Civic Building Medal, Canton of ZürichArchive Pavilion TössDistinction
2022Ticino Stone and Concrete PrizeCasa Tre MuriWinner
2021Library Design Award, BaselRhine Reading RoomMention
2020Urban Infrastructure AwardFire Station NorthWinner
2019Milano Façade PrizeKontor QuattroShortlist

Team

Partners and associates. Every project is led by one of them from competition to handover.

Architects, engineers and model makers
34
Nationalities in the studio
09
Studios: Zürich, Basel, Milano
03
Partners and associates with role, studio and year joined
NameRoleStudioSince
Lena BrändliFounding partnerZürich2004
Matteo SangiorgiPartnerMilano2009
Ines KowalczykPartner, design technologyZürich2012
Ruedi AmmannAssociate, constructionZürich2011
Aiko TanabeAssociate, competitionsBasel2015
Nils VogtModel workshop leadZürich2016
Jonas FeuzProject architectZürich2018
Sara AchterbergLandscape architectBasel2020

Open position Project architect, 80–100 %, Zürich

Five years’ experience on public buildings and fluent German. Send ten pages of work, nothing more, to jobs@monolith-atelier.example.

Contact

New projects and competitions. We reply to every enquiry within five working days.

Tell us about the site.

Studio Zürich

Werkgasse 27
8005 Zürich, Switzerland
+41 44 555 01 27
studio@monolith-atelier.example

Basel

Uferweg 9, 4057 Basel
+41 61 555 01 84

Milano

Via dei Tessitori 14, 20144 Milano
+39 02 555 013 90

Zürich, local time

--:--CET

Studio hours Mon–Fri, 08:30–18:00. The second hand pauses at twelve, like every good station clock.

Project enquiry

Project type

This is a demonstration form. Nothing is sent or stored.